Following a preliminary site investigation, Robert Long Consultancy Limited was commissioned to arrange and supervise remediation works. A ‘pump and treat’ scheme was designed, involving a series of boreholes installed between the contamination source and the watercourse, (the receptor). We worked closely with our contractors, Telluric Limited, to assess traces of TPH (Total Petroleum Hydrocarbons) found during the preliminary site investigation. We have since provided evidence of satisfactory ground conditions to the Environment Agency.
 |